Planningvia Cumbria Council Planning
Install chargepoint on the front of the building, with the connecting cable leading to the adjacent highway. To ensur...
Install chargepoint on the front of the building, with the connecting cable leading to the adjacent highway. To ensure the connecting cable does not trail across the pavement, a pavement channel runni
Install chargepoint on the front of the building, with the connecting cable leading to the adjacent highway. To ensure the connecting cable does not trail across the pavement, a pavement channel running from the property boundary to the edge of the pavement will also be installed as part of Westmorland and Furness Council's Trial EV Pavement Channel Project.
Address: 3 St Georges Square Barrow-In-Furness Cumbria LA14 2JQ
Ref: B21/2026/0183
Status: Undecided

Comments
No comments yet. Be the first to share your thoughts!